First deployment of the buoy 1/14 Mark Clapsadl working on the buoy electronics. Download Image 2/14 Setting up the crane on the boat. Download Image 3/14 Lifting the buoy onto the deck of the boat. Download Image 4/14 Getting ready to deploy the buoy at the station. Download Image 5/14 Getting ready to deploy the buoy at the station. Download Image 6/14 Buoy chain and line. Download Image 7/14 Kit Hastings Download Image 8/14 Dropping the buoy's anchor. Download Image 9/14 Buoy in the water! Download Image 10/14 Buoy in the water! Download Image 11/14 Buoy in the water! Download Image 12/14 Kit Hastings and the buoy. Download Image 13/14 S-2 Tidas 900. This buoy was retired and replaced in 2021. Download Image 14/14 Buoy in the distance. Download Image